CHESAPEAKE, Va. (WAVY) — Motorist can expect overnight lane and ramp closures as work continues on the I-64 Southside Widening and High Rise Bridge Project.

There will be alternating single-lane closures in both directions from Bowers Hill and Shell Road between Aug. 23 and Aug. 30 from 8 p.m. to 5 p.m.

For the up-to-date road conditions, motorists can use VDOT’s free mobile app to check traffic, incidents, construction, and congestion. Information is also available at 511Virginia.org or by calling 511 while in Virginia.